North Devon and Cornwall Junction Light Railway

North Devon and Cornwall Junction Light Railway
Legend
North Devon Railway
Torrington
River Torridge
Watergate Halt
Yarde Halt
Dunsbear Halt
Marland Works
Remaining stub of Torrington and Marland Railway
Petrockstow
Meeth Works
Wooladon Clay Pits
Meeth Halt
Hatherleigh
Hole
Okehampton to Bude Line to Bude
North Cornwall Railway
Halwill Junction
Okehampton to Bude Line to Okehampton

The North Devon and Cornwall Junction Light Railway was a railway built to serve numerous ball clay pits that lay in the space between the London and South Western Railway's Torrington branch, an extension of the North Devon Railway group, and Halwill, an important rural junction on the North Cornwall Railway and its Okehampton to Bude Line.

Ball clay was an important mineral but its weight and bulk required efficient transportation; the material had been brought to main line railways by a 3 ft  (914 mm) gauge tramway. Expanding volumes prompted conversion to a light railway -- requiring less complex engineering and operational procedures than a full railway -- and it was opened on 27 July 1925[1].

Passengers were carried in addition to the mineral traffic, but the business largely consisted of workers at the ball clay pits themselves. (Thomas[1] says, "The largest place on the railway is Hatherleigh ... a market town in the centre of a barren countryside, it is badly decayed".)

The conversion from a tramway was overseen by Colonel Stephens, the famous owner and operator of marginal English and Welsh railways. Although in construction details typically Stephens this was visually a Southern Railway branch line . It survived in independent status until nationalisation of the railways in 1948, and continued in operation until 1 March 1965. The northern part from Meeth and Marland, which was reconstructed from the narrow gauge railway, continued to carry ball clay, but not passengers, until August 1982. (Thomas[1] calls the siding "Marsland" on page 77 but this is an error[2][3][4].)

Route

Built as cheaply as possible, and partly following the alignment of the former tramway, the railway had continuous sharp curves and ruling gradients in the range of 1 in 45 to 1 in 50.

The stations on the line were[5]:

The line was single throughout, worked by Electric Train Token, and with a maximum speed of 20 mph from Torrington to Dunsbear Halt, and 25 mph from there to Halwill[4].

The 1964/65 working timetable[3] shows two throughout trains each way daily, taking about 80 minutes by diesel multiple unit for the 20 mile journey. There were three freight trains Mondays to Fridays serving the clay sidings from the Torrington end. There were no trains on Sundays.

See also

References

  1. ^ a b c St John Thomas, David (editor), Regional History of the Railways of Great Britain: Volume 1 - the West Country; David & Charles, Newton Abbot, 3rd edition 1966)
  2. ^ North Devon Clay; Messenger, Michael; 1982; Twelveheads Press, Truro; ISBN 0 906294 06 1
  3. ^ a b Working Time Table, Section P, Winter 1964/65, British Railways Western Region, Plymouth
  4. ^ a b Sectional Appendix, Western Section; British Railways, Southern Region; Waterloo Station, 1960
  5. ^ Cobb, Col M. H., 2003; The Railways of Great Britain: A Historical Atlas; Ian Allan Publishing Ltd; ISBN 07110-3002-2